Deann painted the ceiling in the bathroom (and cleaned the dust from the kitchen, and mowed the front lawn...), and I painted the walls later. This is the untouched-up pass. The sink and the toilet are now permanently installed. A couple of pin-hole leaks have developed in the plumbing, in the basement, in the hot water pipe as it goes up to the bathroom. I had to take a break from painting to (try to) fix that. More trips to the hardware store are probably in store for tomorrow. The cabinet needs some more sanding and then is ready to install. The new legs for it are made and ready to go on.
No sign of the contractor today. The tile needs to be sealed.